Results from the March 2021 cycle

We received 24 proposals and 13 proposals (6 at GN and 7 at GS) were awarded from this cycle.  Total awarded hours are 19.41hr to successful GN proposals and 19.12hr to GS proposals. 10 proposals were submitted by the PIs from the US, 2 from Brazil, and 1 from Korea.

Congratulations!

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.